Home > Products > Oil Filter > Replacement Hydac Hydraulic Oil Filter2600r010bn3hc
              Replacement Hydac Hydraulic Oil Filter2600r010bn3hc
              • Replacement Hydac Hydraulic Oil Filter2600r010bn3hcReplacement Hydac Hydraulic Oil Filter2600r010bn3hc

              Replacement Hydac Hydraulic Oil Filter2600r010bn3hc

              Replacement Hydac Hydraulic Oil FilterTechnical Details:Absolute filtration typically ßx(c) ≥ 1000High ßx value stability across a wide range of differential pressuresHigh contamination retention capacityDisposable elements and cleanable elemen......

              Send Inquiry

              Product Description


              Replacement Hydac Hydraulic Oil Filter
              Technical Details:
              Absolute filtration typically ßx(c) ≥ 1000
              High ßx value stability across a wide range of differential pressures
              High contamination retention capacity
              Disposable elements and cleanable elements
              Elements pleated
              Flow direction from out to in to maximize stability
              Excellent flow fatigue stability due to solid filter material support
              Standard filtration ratings: 3μm, 5μm, 10μm, and 20μm absolute
               
              Advantages:
              Longer Equipment Life
              Less Downtime
              Higher System Efficiency
              Less Energy Loss
              Longer Fluid Life
              Lower Operating Cost
              Lower Maintenance Cost

              Part #
              2600R010BN3HC
              TypeReturn Line Filter Element
              Dimension(OD)143.5*(ID)96.5*(L)921 mm
              Filter MaterialFiberglass
              Micron Rating10 Micron
              End CapsPlastic
              Inner CoreGalvanized perforated plates
              O-RingBuna
              MOQNO MOQ . But advice full container to save cost.
              20 GP  FCL:     1044  pieces 
              40 GP  FCL:     2114  pieces
              40 HQ  FCL:     2438  pieces
              Loading PortShanghai
              Lead TimeAround 14 days for 20GP container
              PaymentT/T ; West Union ; Paypal
              ShipmentBy sea to your nearest port
              By air to your nearest airport
              By express (DHL,UPS,FEDEX,TNT,EMS) to your door
              PackageCarton
              Max CapacityAround 1000 pcs per week
               

              Related Category

              Send Inquiry

              Please Feel free to give your inquiry in the form below. We will reply you in 24 hours.
              Click Refresh verification code

              Leave Your Message

              • Click Refresh verification code